Saturday, January 15, 2011

Another day's work

First things first...
The plumbing passed! wahoo!!

Jesse's parents came to help re-stack the lumber this morning, which was awesome!
Then Jesse and I got to work raking the stones in the master suite to level things out.
We unrolled plastic over the whole floor... check.
 Then worked on laying the concrete/syrofoam insulation slabs on top... check.
We used more recycled/salvaged foam like we did in the basement.
After that we put down the wire meshing that the radiant tubing will be connected to... sorry no pictures, but I promise it was done... check.

This week we are hoping for some warm and dry weather to pour the concrete on the master suite floor, however the forecast doesn't look too hopeful.
Jesse is also hoping to begin the framing of the house this week, if we're lucky. yay! So excited for this stage in the process to see this house get out of the ground.

P.S.  Sorry for the lousy pictures, they were taken on Jesse's phone.